Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

New solar panels manufacturing plant in Stara Zagora will need workers from the region

Photo: Pixabay

A groundbreaking ceremony for a plant for the manufacture of photovoltaic panels and cells is to take place in the region of Stara Zagora by the end of this year. 15-20 hectares of land will be needed to build the plant and the investor has been working together with the municipality to provide the terrain needed. The new plant will create 350-500 jobs, and with the start of production of photovoltaic cells, their number will go up to 800.  

Compiled by Yoan Kolev

Translated and posted by Milena Daynova



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Bulgaria's first state budget in euros – between two readings in the National Assembly and a wave of dissatisfaction

The draft state budget was adopted in first reading by the National Assembly on November 21. However, the planned changes in the financial framework for 2026 triggered an open clash between the ruling coalition, led by GERB party, and the opposition..

published on 11/24/25 2:25 PM

KBC Group raises its forecast for Bulgaria's economic growth in 2026

KBC Group expects the Bulgarian economy to grow slightly more next year in comparison to its previous forecasts, according to the conclusions of the Belgian financial group's latest assessments of the economies of Central and Eastern..

published on 11/20/25 8:50 AM

BNB: Bulgaria posts strong FDI inflows from Netherlands, Italy, Greece; outflows led by U.S.

Foreign direct investment (FDI)  in Bulgaria posted the largest net inflows from the Netherlands, Italy and Greece in the first half of 2025, the Bulgarian National Bank (BNB) said. Net FDI inflows totalled €554.9 million from the Netherlands, €325.2..

published on 11/19/25 5:41 PM