Bulgaria’s Parliament rejected a proposal for consideration of a draft decision for the construction of new capacities at the Kozloduy nuclear power plant. MP Delyan Dobrev, Chairman of the National Assembly Energy Committee, asked the parliament to consider the draft decision which had already been approved by the Parliamentary Committee on Energy and the Parliamentary Committee on Environment and Water. However, it was rejected by the plenary with 102 votes in favour, 61 against and 51 abstentions. BTA reports.
The draft decision envisages that NPP Kozloduy - New Capacities start, conduct and conclude negotiations with Hyundai for the construction of Units 7 and 8 in Kozloduy NPP. Hyundai was shortlisted to build Units 7 and 8 at Kyzluduy NPP in competition with 2 American and 2 Chinese companies. The parliamentary committees rejected the proposal to invite the US company Bechtel for negotiations.
Hyundai fears unfair competition from some of its competitors in the construction of units 7 and 8 of the Kozloduy NPP using Westinghouse's AP1000 technology. The company emphasizes that it will cooperate with the South Korean embassy in Sofia to overcome the difficulties. Hyundai's position was published by the South Korean embassy in Bulgaria, BGNES reported.
In the space of 15 years, from 2005 until 2020, 75% of the farms in the country have disappeared – from 500,000 in 2005 down to 132,000 in 2020, said Prof. Dr. Bozhidar Ivanov, Director of the Institute of Agrarian Economics at an international..
In October 2024, the total business climate indicator decreased by 5.6 percentage points compared to September, dropping from 22.5% to 16.9%. The index declined in all monitored sectors, the National Statistical Institute announced. In industry, the..
Petar Ganev , senior researcher at the Institute for Market Economics announced, for the BNR, the publication of their white paper of the Bulgarian economy – Unlocking growth: the road ahead after the election. “Concord should be sought and..
+359 2 9336 661