The transition from Russian nuclear fuel from "TVEL" to the American fuel from "Westinghouse" will start in May with the loading of 43 cartridges in the reactor core of the fifth unit of the Kozloduy NPP. The process of replacing the cartridges will last 4 years. This was announced at a briefing by the chair of the Nuclear Regulatory Agency, Tsanko Bachiyski, quoted by BTA.
The executive director of Kozloduy NPP, Valentin Nikolov, recalled that the process of preparation for switching to Westinghouse fuel began in 2019 with the signing of a contract with the company. According to him, during the entire period, control was also carried out over the production process of assembling the nuclear fuel.
We want to buy a system that has maximum protection against drones. This does not mean that it has a mechanical effect on the drone, but at least that it has some electromagnetic or blocking control of the device. This was explained to BNT by Maj. Gen...
Slovak Ambassador Vasil Grivna was summoned to the Ministry of Foreign Affairs over official statements made by Slovak President Peter Pellegrini during his visit to Skopje on October 14. There were unacceptable assessments made..
On behalf of the Head of State Rumen Radev, Vice President Iliana Iotova presented the Order of Sts. Cyril and Methodius, first degree, to Professor Ma Sipu, the press office of the president reported. The award was presented at..
+359 2 9336 661