Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

F-16 Block 70 aircraft to be maintained entirely in Bulgaria

Defense Minister Atanas Zapryanov
Photo: BTA

The rearmament of the Bulgarian Air Force with F-16 Block 70 aircraft will contribute to the introduction of new technologies at the Avionams Aircraft Repair Plant for the maintenance of the fighter aircraft entirely on Bulgarian territory. There will be no need to send this aircraft abroad, which saves costs and builds the necessary capacity of specialists, Bulgaria’s caretaker Minister of Defense Atanas Zapryanov said at a seminar entitled "Innovations in the Bulgarian Defence Industry and the Modernization of the Bulgarian Armed Forces".

The seminar was held under the auspices of Defense Minister Atanas Zapryanov and the Economy and Industry Minister Petko Nikolov. The decision to build basic national capacities for the maintenance of F-16 Block 70 fighters was taken at the beginning of April by the Nikolay Denkov cabinet.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Classic car parade takes place in Burgas today

The 17 th classic car and motorcycle parade is to take place in Burgas’ Primorski Park from 10 AM until 2.30PM today. More than 150 collectors from Burgas and the country will take part, Dimo Dzhambazov, chair of the Retro motor club, organizer of..

published on 7/6/24 7:55 AM

Weather forecast: Over the weekend temperatures will rise

On Saturday the weather will be sunny, with cumulus clouds developing in the afternoon in many parts. Temperatures will continue to rise, with minimum temperatures reaching 15-21° C., for Sofia 17° C. Daytime highs will range from 30° C., to 35° C.,..

published on 7/5/24 6:45 PM

Repair works on the Danube bridge near Ruse to be carried out without stopping traffic

The major repair works on the Danube bridge near Ruse, which will begin on 10 July, will be carried out without stopping traffic and without closing the facility, the Road Infrastructure Agency said, refuting false information published in the Romanian..

published on 7/5/24 6:13 PM