In Sofia, two agreements have been signed for the construction of parts of the Vertical Gas Corridor, which has given a start to the actual activities aimed at increasing the capacities between Greece, Bulgaria and Romania.
After the completion of the project, the Bulgarian gas transmission infrastructure will be able to supply additional quantities of liquefied natural gas from reliable sources, including the USA, Azerbaijan, Egypt and others. The project is a joint one between Bulgaria, Greece, Romania, Hungary, Slovakia, Ukraine and Moldova and aims to increase the security and diversification of sources and routes for transferring additional quantities of natural gas from south to north. The corridor is expected to be completed in late 2025.
At the end of this year, it is expected that the transfer of Russian gas through Ukraine would be stopped.
Seven-year-old Magdalena Stoyanova from art school "Kolorit" in Pleven received a gold medal and a distinction from the international children's drawing competition "Health 2025". The award ceremony took place in Sao Paulo,..
A 6-month reconstruction of the runway and renovation of the aprons start at Burgas Airport. November 10 marks 19 years since the start of the Burgas Airport concession. The investment in one of the largest infrastructure projects by..
Bulgaria is strengthening land, water and air security (including with a drone protection system) at Lukoil's sites on its territory, the government press service announced. The State Agency for National Security (SANS) entered the..
The Sofia City Court has postponed the extradition case of Igor Grechushkin, the owner of a cargo ship linked to the explosion at the port of Beirut in..
The Road Infrastructure Agency (RIA) has proposed the introduction of temporary restrictions on the movement of heavy trucks weighing over 12 tons along..
On Tuesday, minimum temperatures will range from 8 to 13°C , with Sofia seeing around 9°C. Rain is expected across the country, with heavier showers in..
+359 2 9336 661