The scheduled annual maintenance of Unit 5 of the Kozloduy Nuclear Power Plant has been completed, the plant announced. The unit was reconnected to the national electricity grid at 9:53 AM following an inspection and a positive assessment by the Bulgarian Nuclear Regulatory Agency.
BTA recalls that Unit 5 of the Kozloduy NPP was shut down for scheduled annual maintenance and refueling with nuclear fuel on May 5. As part of Kozloduy NPP's programme to diversify nuclear fuel supplies, 43 fuel assemblies manufactured by Westinghouse were loaded into the reactor. This marks the beginning of a four-year process of Unit 5's phased transition to RWFA nuclear fuel.
On October 21, the Ministry of Finance assumed domestic debt and sold government securities for 145 million euros with 3-year maturity. In 2025, the state assumed domestic debt of 1.45 billion euros. Debt of 7.2 billion euros was..
Foreigners often want to pay in euros. The reason is that the goods already have a price in the European currency, the commercial establishments in Kyustendil say. Sellers have some difficulties explaining that this cannot be done..
Today, architecture students from the University of Architecture, Civil Engineering and Geodesy in Sofia are presenting new proposals for integrating the remains of the Roman Villa Rustica into the city's modern urban environment. Their aim,..
In September, Bulgaria was mentioned as a country connected with dangerous food 7 times, indicate data of the European Rapid Alert System for Food and..
The legal heirs of the people who lost their lives during the flooding in the region of Burgas at the beginning of October will receive 15,000 leva (EUR..
A meeting of the coalition partners took place early this morning, during a sitting of the National Assembly, to discuss the possible reformatting of..
+359 2 9336 661