Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Bulgaria will take the necessary actions related to the energy transition

Photo: BTA

EUR 479 million are the grants allocated to Bulgaria under the RePowerEU chapter which is part of the Recovery and Resilience Plan. By the end of last year, our country could have received 30% of this resource in advance. At a hearing of caretaker Deputy Premier and Minister of Finance Lyudmila Petkova and Minister of Energy Vladimir Malinov in Parliament, it transpired that two changes are being prepared in the energy sector under the Recovery and Resilience Plan in the RePowerEU part with the aim of obtaining additional grant resources.

According to Energy Minister Vladimir Malinov, the country must take the necessary actions by the end of the year to receive payment under this chapter. Negotiations with the European Commission are ongoing, and the cabinet's goal is to synchronize the proposed reforms with the National Assembly before approving them in a session.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Festive Christmas spirit pervades the Bulgarian capital

Sofia will welcome the Christmas and New Year holidays with brilliant decorations in all areas of the city. A major highlight in the transformation of the capital will be the beautiful Christmas trees placed in key locations. The tallest among..

published on 11/24/24 9:50 AM

Sunny but chilly Sunday

Overnight it will be mostly clear. Winds will weaken and die down in many areas. In the morning it will be cold, with minimum temperatures between minus 7 and minus 2°C, reaching minus 10°C in the valleys and around minus 9°C in Sofia. Tomorrow will be..

published on 11/23/24 7:05 PM

Unit 6 of Kozloduy NPP connected to the national grid after annual maintenance

The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07 following an inspection by the Nuclear Regulatory Agency. In addition to the repairs made to improve..

published on 11/23/24 2:09 PM