Toshiba Energy Systems & Solutions Corporation will assist Bulgaria in bringing the Chaira power plant back into operation as soon as possible. The news was announced after the visit of the Bulgarian Minister of Energy, Vladimir Malinov, to Tokyo.
The Chaira pumped-storage hydroelectric power station in Rila, below the Belmeken dam, is the largest underground power station in south-east Europe, with four reversible pump turbines. However, it has been out of operation since 2022 due to its out-of-service turbines.
Toshiba is the manufacturer and supplier of the plant's equipment and the owner of the technical and manufacturing documentation for the project. This made it imperative to award the repair work to this manufacturer, the Energy Ministry said.
During Malinov's visit, it also became clear that Hitachi is interested in participating in the development of Bulgaria's power grid and is ready to share its experience in building transformers and small modular reactors.
The year 2024 marks 115 years since the first official contacts between Bulgaria and Japan and 85 years since the establishment of diplomatic relations between the two countries.
On Wednesday , the lowest temperatures will be between 3 and 8°C. In the regions with strong wind it will be up to 10-12°C. In Sofia it will be around 4°C. In the western parts of the Danube Plain and the Upper Thracian Plain it will..
Following a series of fires in the Burgas area last summer, including one that destroyed homes in a local villa district, the Burgas municipality has acquired high-tech drones equipped with thermal cameras, night vision, and 3D imaging . The two..
Illegal migrants from Syria, Iraq and Iran have been discovered in Sofia, and ten members of an organised criminal group have been arrested , Deputy City Prosecutor Desislava Petrova told reporters. Two of those arrested have been charged as the..
+359 2 9336 661