Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Investigators of L-39 crash in "Graf Ignatievo" are working on three versions

Graf Ignatievo base
Photo: BTA

Human error, a technical malfunction or an incorrect command are the versions on which investigators of the reasons that led to the crash of the L-39 training aircraft in "Graf Ignatievo" work. This is what Major Hristo Anchev, a supervising prosecutor from the Military District Prosecutor's Office Plovdiv, told BNT. According to him, the reason cannot be clarified quickly. 

Investigators expect data from the black box to narrow down the versions, but experts will say whether it can be read. The legal period for an investigation is 2 months, but it can be extended, Major Anchev added. The flight that cost the lives of pilots Major Petko Dimitrov and Senior Lieutenant Ventsislav Dunkin, lasted exactly 13 minutes. They took off on September 13 at 12:17 p.m. Witnesses said the plane plummeted in a straight line, leaving the formation of two other planes.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Festive Christmas spirit pervades the Bulgarian capital

Sofia will welcome the Christmas and New Year holidays with brilliant decorations in all areas of the city. A major highlight in the transformation of the capital will be the beautiful Christmas trees placed in key locations. The tallest among..

published on 11/24/24 9:50 AM

Sunny but chilly Sunday

Overnight it will be mostly clear. Winds will weaken and die down in many areas. In the morning it will be cold, with minimum temperatures between minus 7 and minus 2°C, reaching minus 10°C in the valleys and around minus 9°C in Sofia. Tomorrow will be..

published on 11/23/24 7:05 PM

Unit 6 of Kozloduy NPP connected to the national grid after annual maintenance

The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07 following an inspection by the Nuclear Regulatory Agency. In addition to the repairs made to improve..

published on 11/23/24 2:09 PM