Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

The construction of the Shipka tunnel may begin by the end of 2025

Photo: banker.bg

Another major infrastructure project in Bulgaria is moving forward. The technical project for the construction of the tunnel under Mount Shipka will be ready this year. If approved, the construction of the facility will begin as early as 2025, Minister of Regional Development and Public Works Ivan Ivanov said in response to an inquiry from MP Lyuben Ivanov. The facility is part of the cross-border north-south corridor.

If there are no obstacles to the finalized project and the state issues a construction permit, the long-awaited tunnel under Mount Shipka should be completed by 2029. The tunnel will be 3.2 km long, thus becoming the longest road tunnel in the country. There are also four smaller tunnels, ranging from 90 to 290 meters. Part of the project includes the Gabrovo bypass road, as well as the approach to the tunnel, which have a total length of 10.5 km.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Temperatures will rise at the end of the week

On Saturday, minimum temperatures will range from 13 to 19 °C . In Sofia, it will be 15 °C. Sunny weather will prevail with temporary cloud cover increasing in the afternoon. Maximum temperatures will rise to between 28 and 33 °C. In the capital, it will..

published on 7/11/25 7:25 PM

Robotic surgery factory opens in Parvomay

A global leader in the production of robotic and minimally invasive surgical equipment has officially opened a new manufacturing facility in Parvomay , Plovdiv Province, as part of its planned expansion in Europe, BNR Plovdiv reports. The American..

published on 7/11/25 4:52 PM

President requests inquiry into missed benefits in Botas contract

'It is blatantly untrue that the contract with the Turkish state-owned company Botas is not being put into use." President Rumen Radev stated this to journalists at the Krumovo Air Base. The terminal in Alexandroupolis has not been operational..

published on 7/11/25 3:51 PM