Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

According to expert estimates

More than EUR 1 billion per year are needed to improve road infrastructure

Yasen Ishev
Photo: BTA

Improving the road network requires around EUR 1 billion annually for a period of 10 years. In an interview with BNR, Yasen Ishev, Chairman of the Scientific and Technical Union for Transport and a road construction specialist, pointed out that about EUR 600 million have been allocated for road maintenance for 2025, while more than EUR 17 billion are needed just for road inspections. 

According to him, another reason for the poor road statistics, apart from the fault of drivers, is corruption. Yasen Ishev called on the state to take action, because an inspection of the road structure revealed that about 10% of the construction materials are missing. The expert pointed out that the first step should be to conduct a road safety audit, focusing on sections with a high concentration of accidents. "A black spot road sign is not enough. Road geometry and visibility also need to be improved. There are problematic sections, but there's no comprehensive plan to deal with them'', said Yasen Ishev.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Prime Minister Rosen Zhelyazkov (C) and European Council President Antonio Costa (R).

President of the European Council and Bulgarian PM visit Kazanlak Arsenal military factory

The President of the European Council, Antonio Costa, and Prime Minister Rosen Zhelyazkov visited Arsenal, Bulgaria's largest arms manufacturer, in Kazanlak. The management of the factory presented the technological capabilities of the plant, its main..

published on 4/28/25 3:48 PM
Tomislav Donchev

Payments under the RRP have doubled in recent months

Payments under the Recovery and Resilience Plan (RRP) have doubled in recent months, Deputy Prime Minister Tomislav Donchev has announced. He added that he was optimistic about receiving the delayed tranches and the remaining funds under the RRP...

published on 4/28/25 2:55 PM

State Intelligence Agency reports high number of vacant positions and chronic underfunding

Despite active and targeted efforts to recruit personnel, the percentage of vacant positions at the State Intelligence Agency (SIA) remains high, reads the 2024 report of SIA, published on the website of the Council of Ministers. Another issue..

published on 4/28/25 1:22 PM