A tender for the design and construction of Terminal 3, pre-terminal space, transport hub and modernization of the existing Terminal 2 at Sofia's Vasil Levski Airport has been launched, the airport operator SOF Connect announced.
It will invest 230 million euros in the project with additional investments in equipment of 25.5 million euros. "This is the largest public infrastructure development project to be implemented in the country in the next five years," the company said. They expect that by 2031 Bulgaria will have a world-class airport, BTA has reported.
Editor: Miglena Ivanova
Publication in English: Al. Markov
Photo: SOF Connect
‘This is not the time for early elections,’ said Prime Minister Rosen Zhelyazkov at a GERB party conference. According to BTA, he was opposed to holding elections during the country’s planned adoption of the euro in 2026. GERB chairman Boyko..
The Sofia Appellate Court left in custody Varna Mayor Blagomir Kotsev, who is charged with corruption and participation in an organized crime group. The judgment is final. One of the three judges, Andrey Angelov, signed with a dissenting..
Bulgaria’s Minister of Justice Georgi Georgiev conferred in Brussels with the European Commission team responsible for the Resilience and Recovery Plan (RRP) reforms in Bulgaria, reported the Ministry of Justice. EC: RRP payment depends on..
On Tuesday , the lowest temperatures will be between 2 and 7°C. In the valleys and high fields the temperature can drop to minus 2°C;..
Bulgaria, Greece and Romania have finalized a memorandum for joint cooperation on new transport projects, said European Commissioner for..
The European Public Prosecutor’s Office has carried out searches in the Municipality of Plovdiv and in a company suspected of public..
+359 2 9336 661