The annual planned maintenance of Kozloduy NPP Unit 6 starts today and is expected to last until early December, the nuclear power plant has announced.
During the shutdown, technical maintenance of the systems and facilities will be carried out, which will ensure the safe and reliable operation of the unit. The planned measures related to the long-term operation of the nuclear power plant units will also be implemented. Unit 6 will also be reloaded with fresh nuclear fuel.
Editor: Diana Tsankova
Publication in English: Al. Markov
Photo: BGNES, library
On Thursday minimum temperatures will range between 6 and 11° C., for Sofia around 8° C. During the day the weather will continue cloudy and rainy. The rain will be more significant in Eastern Bulgaria, and in the afternoon – in Central Bulgaria...
The European Commission has decided to withhold EUR 215 million from the second payment under Bulgaria’s recovery and resilience plan, the EC told the Bulgarian National Radio. The country is to receive EUR 439 million. EU may cut money for..
With 111 votes for, 51 against and 43 abstained, the National Assembly approved the establishment of an ad-hoc committee to investigate the activities of George Soros and his son Alexander Soros and their foundations in this country financing..
The European Commission has presented a proposal for developing high-speed railway lines within the EU until 2040, linking the capitals in the EU, among..
The European Commission has decided to withhold EUR 215 million from the second payment under Bulgaria’s recovery and resilience plan, the EC told the..
Birth rate in Bulgaria has decreased by 33% over the past three decades. In 1994, 79,442 live births were registered in the country, while in 2024 the..
+359 2 9336 661