Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

China shows interest in Bulgarian energy projects

Photo: BGNES

Bulgarian Minister of Energy, Temenuzhka Petkova, has met with representatives of the China General Nuclear Power Group (CGN), it was reported. The meeting was held at the initiative of the Chinese side and talks focused on potential cooperation in the sphere of nuclear energy. Minister Petkova has made the Chinese delegation acquainted with the views of the Bulgarian government regarding the possible construction of a new nuclear power plant in this country. This could happen in case a strategic investor was found and without providing state guarantees and long-term contracts for the purchase of energy produced. The Ministry of Energy has also provided information about the parameters of the "Belene" project, current infrastructure, permits and licenses, 3e-news.net has reported.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

GERB will not sign PP/DB’s declaration for a cordon sanitaire around Delyan Peevski, Boyko Borissov says

During the regional GERB youth academy in Targovishte, GERB leader Boyko Borissov stated that GERB would not sign the declaration of We Continue the Change/Democratic Bulgaria (PP/DB) for a cordon sanitaire around Delyan Peevski. PP/DB calls..

published on 11/30/24 3:17 PM

Protest in Velingrad in support of farmers with flocks which tested positive for sheep and goat plague

A protest took place in Velingrad in support of the farmers whose flocks of sheep have been quarantined because of positive tests for sheep and goat plague. To stop the spread of the disease, access to the area around the farms has been..

published on 11/30/24 1:10 PM

EC gives Bulgaria 6 months to introduce necessary reforms under the Recovery and Resilience Facility, or it may lose EUR 653 million

Bulgaria will be given six months to carry out the necessary reforms connected with the liberalisation of the energy market , otherwise it stands to lose EUR 653 million which it should receive as a second payment under the Recovery and..

published on 11/30/24 11:55 AM