The 5th unit of Kozloduy nuclear power plant has been going under a planned annual maintenance and modernization. The unit will be loaded with fresh nuclear fuel during the maintenance campaign. Some measures aimed at extending the life of the 1,000 megawatt reactor will be also fulfilled. Its thermal power is expected to increase with 4% after the annual maintenance. The maintenance of the 5th reactor at Kozloduy NPP will continue until mid June. Currently the 6th nuclear reactor is functioning at its full capacity.
On Saturday, after the expected overnight rainfall, morning temperatures will range between 8°C and 13°C. In Sofia, it will be around 11°C. During the day, clouds will be mostly significant but high. Winds will increase from the south-southwest,..
The emblematic monument of Bulgaria's national hero - the poet-revolutionary Hristo Botev in the center of the city of Vratsa has been dismantled for restoration . For this purpose, the nine-meter statue will be transported to a specialized workshop in..
The prehistoric complex "Provadiya-Solnitsata" - the oldest salt production and urban centre in Europe (5600 - 4350 BC) - is among the sites nominated for the European Heritage Label 2025. This year, the European Commission received a total of 21..
Bulgarian citizens and road hauliers should avoid traveling to Serbia on March 15 and 16 except in cases of extreme necessity , until the protest actions..
Bulgarian Ambassador to the United States Georgi Panayotov and Raycho Raychev, founder and CEO of the Bulgarian company EnduroSat , met with experts..
The prehistoric complex "Provadiya-Solnitsata" - the oldest salt production and urban centre in Europe (5600 - 4350 BC) - is among the sites nominated..
+359 2 9336 661