The 5th unit of Kozloduy nuclear power plant has been going under a planned annual maintenance and modernization. The unit will be loaded with fresh nuclear fuel during the maintenance campaign. Some measures aimed at extending the life of the 1,000 megawatt reactor will be also fulfilled. Its thermal power is expected to increase with 4% after the annual maintenance. The maintenance of the 5th reactor at Kozloduy NPP will continue until mid June. Currently the 6th nuclear reactor is functioning at its full capacity.
According to unofficial information, the Hungarian Presidency of the Council of the EU has drafted a decision for the full admission of Bulgaria and Romania to the Schengen Area. The draft document states that from January 1, 2025, checks on persons..
The Constitutional Court has admitted all five requests for the partial or complete annulment of the elections for the 51st National Assembly, submitted by We Continue the Change-Democratic Bulgaria (PP-DB), Vazrazhdane, There is Such a People (ITN),..
New parking lots with over 1,000 parking spaces, including special areas for people with limited mobility and electric vehicle charging stations, were opened at Sofia Airport today. The parking lots are divided into short-term and..
According to unofficial information, the Hungarian Presidency of the Council of the EU has drafted a decision for the full admission of Bulgaria and..
The first marble statue discovered in the ancient city of Heraclea Sintica on 3 July, is probably of Lucius – grandson of Roman Emperor Octavian..
The Bulgarian Hotel and Restaurant Association (BHRA) presented its annual awards for professional achievements in the field of tourism. The Bulgarian..
+359 2 9336 661