The 5th unit of Kozloduy nuclear power plant has been going under a planned annual maintenance and modernization. The unit will be loaded with fresh nuclear fuel during the maintenance campaign. Some measures aimed at extending the life of the 1,000 megawatt reactor will be also fulfilled. Its thermal power is expected to increase with 4% after the annual maintenance. The maintenance of the 5th reactor at Kozloduy NPP will continue until mid June. Currently the 6th nuclear reactor is functioning at its full capacity.
On Thursday it will be sunny and hot again. There will be light wind from the north-northwest. The highest temperatures will be between 36° and 41°C; in Sofia - around 36°C. In the mountains it will be mostly sunny. The wind..
Prime Minister Rosen Zhelyazkov led the Bulgarian delegation at the recently concluded NATO Summit in The Hague. Speaking to journalists, he stated that an agreement had been reached — with Bulgaria’s support — for each allied country to raise its..
The National Revenue Agency is inspecting currency exchange offices due to increased interest in buying euros . Within just one week, the exchange of Bulgarian leva into euros increased by 43%, the agency’s director, Rumen Spetsov, announced in..
The head of state commented on the report adopted by the European Parliament’s Foreign Affairs Committee this week on Skopje’s progress in the European..
Cool air will sweep across the country during the night , accompanied by moderate winds from the northwest. Short-lived rain showers and thunderstorms are..
Generation Z is facing serious difficulties coping with stress, according to results from cadet exams at the Vasil Levski National Military University in..
+359 2 9336 661