Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Protesters against construction of Rumyantsevo 2 hydroelectric power plant block off traffic along Sofia-Rousse main road

Photo: Plamen Hristov

Anglers and environmentalists from all over the country blocked off traffic for about an hour along the Sofia-Rousse main road. No vehicle queues or traffic jams were formed.  

They are protesting in Rumyantsevo village near Lukovit, against the draining of rivers by small hydroelectric power plants and against the construction of Rumyantsevo 2 hydroelectric power station. The protesters are carrying posters, one of which reads: “We want our rivers and our nature. No more hydroelectric power plants.”

The organizers of the protest – the associations Balkanka and Old Otters – say thatthe construction of Rumyantsevo 2 is illegal. The section of Zlatna Panega River falls within a protected area under Natura 2000. There are many species there which are under the protection of the law, but which will vanish from the river section drained by the hydroelectric power station. Its construction is inadmissible under the Danube River Basin Management Plan 2021.  The protestors are demanding that the National Construction Control Directorate conduct an inspection of the construction documents as well as the immediate stop to the plant’s construction.  

Dimitar Kumanov, member of the management council of the Balkanka association says:

“We are protesting against the illegal construction permit, issued for Rumyantsevo 2 hydroelectric power station which will inflict damages on one of the most valuable sections of Zlatna Panega River and its unique biodiversity. We demand that the National Construction Control Directorate launch an inspection of the construction authorization documents for this hydroelectric power plant. There are several violations – the weir on the river is public state property and they have no established right to use the weir and to reconstruct it – its reconstruction means building, as stipulated by the law. They do not have authorization to use a surface water construction project, which is obligatory for the issue of the above-mentioned construction permit. The court itself ruled: “This is an illegal hydroelectric power plant.”



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

PM Rosen Zhelyazkov

Cabinet allocates 15,000 leva to be paid out to heirs of people who lost their lives in the floods

The legal heirs of the people who lost their lives during the flooding in the region of Burgas at the beginning of October will receive 15,000 leva (EUR 7,670), the government has decided, BGNES reports. The 60,000 leva (EUR 30,679) needed has been..

published on 10/21/25 2:58 PM
Tzvetan Spassov, Smilen Valov and Dimitar Kolarov

More and more Bulgarians living abroad want to return to their country

The tendency of Bulgarians returning from abroad is permanent. This became apparent during the forum “Europe is with me”, organized by the Ministry of Labour and Social Policy’s Human Resources Development Programme, the Bulgarian news agency BTA..

published on 10/21/25 2:31 PM

World public service media meet in Sofia, discuss current challenges

There is no democracy and freedom without freedom of speech and pluralism, said President Rumen Radev at the opening, in Sofia, of the annual Public Broadcasters International Conference (PBI 2025) . For the first time, the Bulgarian National Radio..

published on 10/21/25 2:05 PM