Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Bulgaria-Greece gas interconnector should be ready by 2020

Photo: Bulgarian Ministry of Energy

Bulgarian Energy Minister Temenuzhka Petkova and Greek Minister of Environment and Energy Giorgos Stathakis have discussed the realization of Greece-Bulgaria Gas Interconnector project. The two sides will be working on an updated timetable so that the interconnector is put into operation by 2020, in synergy with the launch of the Trans-Adriatic gas pipeline. The tender procedures for the project are expected to be completed by the end of April.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Lilyana Pavlova

Bulgaria will not bail out eurozone countries with debt, Lilyana Pavlova says

Bulgaria will not have to bail out eurozone countries that are experiencing difficulties. This is what Lilyana Pavlova, former vice president of the European Investment Bank, told the Bulgarian National Radio. "In the contracts we..

published on 11/24/25 11:43 AM
Georg Georgiev

Skopje must include Bulgarians in the constitution, Foreign Minister Georgiev says

I have spoken many times with Minister of Foreign Affairs of North Macedonia Timčo Mucunski. He knows our position very well. His role is to convince his own government to abide by the 2022 consensus. This was what Bulgarian Foreign..

published on 11/24/25 9:30 AM

Sofia supports the peace plan in Ukraine, but wants EU's interests to be taken into account

Bulgaria welcomes the consistent efforts of the US and President Donald Trump to establish a just and lasting peace in Ukraine, the Council of Ministers wrote on the government's Facebook page. The final terms of a future peace..

published on 11/24/25 8:54 AM