Because of the coronavirus crisis, the deadline for submitting bids from strategic investors in the Belene NPP project will be extended, Energy Minister Temenuzhka Petkova has told the BNR. The five companies that have already expressed willingness to submit offers remain interested in the project, it was reported.
The Balkan Stream gas pipeline project and the Greece-Bulgaria inter-connector project are progressing within the set deadlines. According to Minister Petkova, the EU will not give up on its ultimate goal - to be leader in the fight against climate changes. Bulgaria has its own framework position, which has already been presented to Brussels. Coal power plants continue to be facilities that are to be relied upon. The Minister said that there were no comments from the European Commission, only a recommendation for increasing the share of RES from 25 to 27%.
Two billion euros in additional state guarantees and a concession of the Bulgarian Sports Totalizator are part of changes to the draft budget for 2026, submitted between the first and second readings. The change that increases the..
The increase in the minimum wage is supported by 54.1% of Bulgarians. 1/3 of respondents believe that the minimum wage should be equal to the living wage. This is indicated by the results of a representative survey by the Myara..
“We see a rational plan for a quick peace from President Donald Trump, according to which the situation on the battlefield is developing extremely unfavorably for Ukraine, and he is trying to prevent a worse scenario and additional casualties,”..
+359 2 9336 661