Bulgartransgaz is launching a procedure for obtaining credit of up to EUR 400 million with a repayment period of 6 years.
The money is for the implementation of key projects such as the Balkan Stream gas pipeline, the Bulgaria-Serbia interconnector, the extension of the gas storage facility at Chiren, northwestern Bulgaria and the company's transmission infrastructure. The money will go to help diversify sources, increase the security of supplies and position the country as a gas distribution centre in the region.
The overall consumer confidence index in October 2025 fell by 4 points compared to July, the National Statistical Institute has reported. In July, the indicator decreased by 4.7 points compared to April. In October, there was an..
By mid-December, all military units in the country will be equipped with drone control simulators, said Major General Deyan Deshkov, Commander of the Land Forces, at the Lyulyak training ground near Stara Zagora. He clarified that the drones have..
Swiss commodity trader Gunvor said it has withdrawn its proposal to buy Lukoil’s foreign assets, including the refinery in Burgas, after the U.S. Treasury called it Russia’s ‘puppet’, Reuters reported. Prime Minister: Bulgaria has a..
+359 2 9336 661