The section of the 2-kilometer “Zheleznitsa” tunnel under construction on the Struma Highway, where rocks collapsed yesterday on three workers, is extremely complex in terms of terrain and land structure.
The high moisture from recent rains is the reason for the crumbling rock to fall on people. This was what the executive director of the contractor company, Stefan Totev, said. He pointed out that the inspection of several institutions and the contractor's experts did not reveal a technological or human error.
The condition of the three injured workers is stable and their lives are out of danger.
Monday will be mostly sunny . There will be temporary increases in cloudiness over the western areas of the country. The wind will be light to moderate from the east-northeast. The lowest temperatures will be between minus 2° to 3°C,..
The presidential institution will host the "Manager for a Day" initiative, the press office of the head of state announced. Two young people will join the working process of the institution tomorrow. The head of state Rumen..
There is a growth in the use of synthetic drugs due to their easy transportation and concealment, said Desislav Mitev, head of a sector in the territorial directorate of the Customs Agency in Ruse. According to the..
Right before the two military pilots training for an air show crashed their plane in the critical seven seconds of the flight there was no communication..
A fire broke out in the Varna office of a party which was represented in the last National Assembly and which is contesting the forthcoming elections on 27..
According to a survey by Gallup International Balkan, one tenth of respondents admit that they would accept to vote in exchange for money, other..
+359 2 9336 661