The section of the 2-kilometer “Zheleznitsa” tunnel under construction on the Struma Highway, where rocks collapsed yesterday on three workers, is extremely complex in terms of terrain and land structure.
The high moisture from recent rains is the reason for the crumbling rock to fall on people. This was what the executive director of the contractor company, Stefan Totev, said. He pointed out that the inspection of several institutions and the contractor's experts did not reveal a technological or human error.
The condition of the three injured workers is stable and their lives are out of danger.
The traffic of trucks in the area of the Danube Bridge at the border with Romania is heavy. This situation is expected to continue over the weekend as the trucks that were waiting at the Kapitan Andreevo crossing at the Bulgarian-Turkish border for..
The truck traffic on the Maritsa highway to the Kapitan Andreevo border crossing at the Bulgarian-Turkish border is now normalized. "As of this morning, there are no more queues of trucks standing on the roadway waiting to cross the border," assured..
At the request of the European Public Prosecutor's Office, searches have been carried out in Sofia, Burgas, Petrich and Rila in connection with an investigation into alleged fraud with EU funds in the restoration of a church. In 2017, a public tender..
According to an analysis by the Electricity System Operator, a shortage of electricity is expected as early as January and February next year. At a..
“It’s time to lift internal border controls now,” European Commissioner for Home Affairs Ylva Johansson believes. In an interview with RFE/RL she..
The Constitutional Court has opened a case following the request by President Rumen Radev for the amendments to the Constitution, endorsed by the 49 th..
+359 2 9336 661