Bulgaria will not provide state guarantees for the Belene NPP project, nor will it conclude long-term contracts for the purchase of electricity, Energy Minister Temenuzhka Petkova has told BNT.
On the question whether the European Commission should re-approve the project documents due to expired permits, Minister Petkova pointed out that this was not an obligation of the state, but of the future investor. The Bulgarian state is obliged to notify the European Commission 3 months before the first contracts with suppliers.
The Minister firmly said the choice of a strategic investor for the construction of the plant had not been made in advance despite signed memorandum with Rosatom, General Electric and Framatome.
Two billion euros in additional state guarantees and a concession of the Bulgarian Sports Totalizator are part of changes to the draft budget for 2026, submitted between the first and second readings. The change that increases the..
The increase in the minimum wage is supported by 54.1% of Bulgarians. 1/3 of respondents believe that the minimum wage should be equal to the living wage. This is indicated by the results of a representative survey by the Myara..
“We see a rational plan for a quick peace from President Donald Trump, according to which the situation on the battlefield is developing extremely unfavorably for Ukraine, and he is trying to prevent a worse scenario and additional casualties,”..
+359 2 9336 661