Turkish Stream project will be delayed by six months and according to Bulgaria’s promise, will be completed at the end of 2020, the Russian energy giant Gazprom writes in a memorandum for new euro-bond issue. The construction of the gas pipeline had to be completed in the first half of 2020, Interfax reminds.
According to the agency, Bulgaria which has not completed its section of the gas pipeline (Balkan Stream) due to the Covid-19 pandemic is the reason for the delay. This country has to build a 474 kilometer-long pipeline from the border with Turkey to the Bulgaria-Serbia border. The project is estimated at EUR 1.1 billion without VAT. Meanwhile, Bulgaria is alreay receiving gas for own consumption from Turkish Stream, Interfax claims.
More bridges over the Danube are not just a bilateral issue between Bulgaria and Romania – they are a strategic priority for the prosperity of the entire EU and for our collective security within NATO. This was emphasized by Deputy Prime Minister..
Today, the deputy PMs and ministers of transport of Bulgaria and North Macedonia Grozdan Karadjov and Aleksandar Nikoloski will sign an agreement on the preparation, construction and operation of a cross-border railway tunnel between the two..
GERB leader Boyko Borisov has told the media that he personally participated in talks with American representatives on the lifting of the Magnitsky sanctions against Bulgarian citizens. He said that he also spoke on the subject with David Cameron while..
Sales of starter sets with euro coins with the Bulgarian national side will begin on December 1, 2025 , the BNB announced. They will be in circulation..
Research ship "Sts. Cyril and Methodius" has departed from Varna after a solemn ceremony. In its fourth voyage to Antarctica the ship..
On Saturday , the lowest temperatures will be between 7 and 12°C; in Sofia - around 8°. In the morning hours visibility will be..
+359 2 9336 661