The termination of the long-term contracts with the thermal power stations “Maritsa Iztok-1” and "Maritsa-Iztok-3” (owned by the US companies АES and ContourGlobal respectively) is to take place by 30 June, 2021, as set down in the market reform schedule of the electric energy industry which the Ministry of Energy has sent the European Commission, BTA reports.
The contracts for the purchase of electric energy from the two power plants were signed by the National Electricity Company in 2001 by the government of Ivan Kostov. Terminating the existing long-term contracts is dictated by the EU rules regarding state aid and the planned wholesale market changes for the deregulation of the market.
The Bulgarian-Moldovan Chamber of Commerce and Industry held a meeting with leading specialists from the energy sector of Bulgaria and Moldova. The online conference was led by the Chairman of the Bulgarian-Moldovan Chamber of Commerce and Industry,..
The draft budget for 2025 proposes a deficit of 3%. The mid-term budgetary forecast targets a deficit of 3% up until 2028. The government debt is to increase to EUR 41.57 billion by 2028. The size of pension insurance is to be preserved in..
In 2025, the National Health Insurance Fund will be able to spend 1.2 billion leva (EUR 613 million) more on insured individuals, the draft budget of its Supervisory Board envisages. The health insurance contribution remains 8% of the insurable..
In 2024, Bulgaria's exports of goods to third countries decreased by 5.1% compared to 2023, amounting to EUR 15.4 billion (30 114.9 million BGN),..
+359 2 9336 661