The termination of the long-term contracts with the thermal power stations “Maritsa Iztok-1” and "Maritsa-Iztok-3” (owned by the US companies АES and ContourGlobal respectively) is to take place by 30 June, 2021, as set down in the market reform schedule of the electric energy industry which the Ministry of Energy has sent the European Commission, BTA reports.
The contracts for the purchase of electric energy from the two power plants were signed by the National Electricity Company in 2001 by the government of Ivan Kostov. Terminating the existing long-term contracts is dictated by the EU rules regarding state aid and the planned wholesale market changes for the deregulation of the market.
Bulgarian exports are expected to grow by 5.8% annually after Bulgaria joins the eurozone. Trade in goods could increase by 3.3%, and in the services sector, growth might reach 8.4%. This is predicted by an analysis by the trade credit insurance..
In 11 district cities in Bulgaria, 1 square meter of residential space costs under EUR 1,000. In 13 district cities, the price ranges from EUR 1,000 to EUR 1,400. In Sofia and Varna, 1 square meter of residential space costs EUR 2,400, National Real..
On the last day of last year, the Egyptian Minister of Investment and Foreign Trade Hassan al-Khatib awarded a total of nine gold licenses at a ceremony at the General Agency for Investment and Free Zones, which was also attended by the Bulgarian..
In 2024, Bulgaria's exports of goods to third countries decreased by 5.1% compared to 2023, amounting to EUR 15.4 billion (30 114.9 million BGN),..
+359 2 9336 661