“The Greece-Bulgaria interconnector should be ready by the end of 2021 so that liquefied gas can flow through it from Alexandroupolis - American, Israeli, Egyptian, from many sources. In future its capacity can be increased to 5 billion cubic metres of gas a year,” said Prime Minister Boyko Borissov who conducted an inspection of the construction work.
The project is important for Bulgaria and for the region because if affords the possibility of diversifying natural gas supply sources, the government press service states.
At this time pipes have been distributed along the 150-km. track in preparation of subsequent activity, along 70 kilometres the pipes have been laid in trenches. The pipeline is 182 kilometres long, 150 of which on Bulgarian territory.
A requiem liturgy has been served in the St. Nedelya cathedral on the occasion of the first anniversary of the death of Bulgarian Patriarch Neophyte. He became patriarch on February 24, 2013. “We know and remember Patriarch..
Support for Ukraine is a losing position, President Rumen Radev said regarding the position of Prime Minister Rosen Zhelyazkov after the meeting between US President Donald Trump and Ukrainian President Volodymyr Zelensky, which..
“We Continue the Change” party has declared full support for President Volodymyr Zelenskyy and the Ukrainian people, who in the most difficult times are defending not only their national interests against the aggressor, but also..
In 2022, 14.7% of workers in the EU were low-wage earners . By definition, low-wage earners are those who earn two-thirds or less of the average gross..
A serious restrictive and even repressive attitude among Bulgarian society on the current issues of school education and upbringing is shown by an..
Foreign Minister Georg Georgiev today received at the Foreign Ministry Susan Falatko, who arrived in Sofia a few days ago as Charge d'Affaires of the U.S...
+359 2 9336 661