“The Greece-Bulgaria interconnector should be ready by the end of 2021 so that liquefied gas can flow through it from Alexandroupolis - American, Israeli, Egyptian, from many sources. In future its capacity can be increased to 5 billion cubic metres of gas a year,” said Prime Minister Boyko Borissov who conducted an inspection of the construction work.
The project is important for Bulgaria and for the region because if affords the possibility of diversifying natural gas supply sources, the government press service states.
At this time pipes have been distributed along the 150-km. track in preparation of subsequent activity, along 70 kilometres the pipes have been laid in trenches. The pipeline is 182 kilometres long, 150 of which on Bulgarian territory.
Funds will be found for both procedures – “Hot Lunch” and “Home Care”, which are among the most sought-after measures to support the most vulnerable members of society. During the parliamentary control sitting earlier today, in response to a..
In support of people with rare diseases, balloons in different colors flew over Sofia at noon, BTA reported. The balloons were released in the courtyard of the Alexandrovska Hospital, where medical specialists, patients and their relatives gathered..
The Ministry of Internal Affairs has detained about 20 people - some of whom worked for the Bulgarian State Railways, for large-scale theft of diesel fuel in a specialized operation in the area of the Karnobat railway station. It was established..
The effects of the protests against supermarkets are being felt, Agriculture Minister Georgi Tahov said in Plovdiv, where he was attending a national..
In 2022, 14.7% of workers in the EU were low-wage earners . By definition, low-wage earners are those who earn two-thirds or less of the average gross..
A serious restrictive and even repressive attitude among Bulgarian society on the current issues of school education and upbringing is shown by an..
+359 2 9336 661