Unit 6 of Kozloduy NPP is temporarily operating at half of its capacity, the power plant has reported. The reason is the shutdown of a pump in the non-nuclear part of the unit. The necessary inspections of the equipment are being performed. The power of the unit will be increased again after it is confirmed that all systems and equipment are working normally. There is no change in the radiation situation on the site of the nuclear power plant.
The other one of Kozloduy's two operating units – Unit 5, is currently not operating because it has been undergoing regular annual repairs.
Education must make children not only knowledgeable but also good people, said Minister of Education and Science Krasimir Valchev at a meeting with His Holiness Daniil, Patriarch of Bulgaria and Metropolitan of Sofia. "We are discussing the..
"Only united will we preserve Bulgaria in the global turmoil. That bright Bulgaria of Levski, which relies on its own strength. The ancient Bulgaria that feels equal to the European nations. That fraternal Bulgaria of free people, which has defended..
The European Union must remain united and predictable in its overall support for Ukraine, Bulgaria’s Prime Minister Rosen Zhelyazkov said in his speech at the second emergency meeting on Ukraine, hosted by French President Emmanuel Macron, announced..
The Vazrazhdane parliamentary party is organizing a protest on February 22 in front of the Bulgarian National Bank against Bulgaria's entry into the..
The agriculture sector in Bulgaria maintains its stability, providing employment to 6% of the population and forming about 4% of the country's GDP. This..
A serious train crash involving a train owned by the Bulgarian company PIMK has occurred near Craiova, Romania. According to initial information, the..
+359 2 9336 661