Unit 6 of Kozloduy NPP is temporarily operating at half of its capacity, the power plant has reported. The reason is the shutdown of a pump in the non-nuclear part of the unit. The necessary inspections of the equipment are being performed. The power of the unit will be increased again after it is confirmed that all systems and equipment are working normally. There is no change in the radiation situation on the site of the nuclear power plant.
The other one of Kozloduy's two operating units – Unit 5, is currently not operating because it has been undergoing regular annual repairs.
The Bulgarian Council of Ministers has not discussed the hypothesis of Bulgaria's possible participation in peacekeeping forces in Ukraine. This was stated to the media by Deputy Prime Minister and Chairman of the Bulgarian Socialist Party (BSP) Atanas..
As Commander-in-Chief of the Bulgarian Armed Forces, I firmly oppose sending troops to Ukraine in any form, said President Rumen Radev during a celebration of the 35th anniversary of the establisment of the Confederation of Independent Trade Unions in..
We are working with the INSAIT Institute in Sofia. If they approve our project, in 2026 we will build an AI factory, Petar Statev from the Supervisory Board at Sofia Tech Park has told the Bulgarian National Radio. The..
The Vazrazhdane parliamentary party is organizing a protest on February 22 in front of the Bulgarian National Bank against Bulgaria's entry into the..
The agriculture sector in Bulgaria maintains its stability, providing employment to 6% of the population and forming about 4% of the country's GDP. This..
A serious train crash involving a train owned by the Bulgarian company PIMK has occurred near Craiova, Romania. According to initial information, the..
+359 2 9336 661