550 megawatts of new gas capacities are going to be built at Varna thermoelectric power station on an investment of 450 million euro, the management of the station, with major shareholder the Movement for Rights and Freedoms’ honorary chairman Ahmed Dogan, has announced.
The two 275 megawatt blocs will be engineered from Siemens technology and will be built by Russian companies. Up to one-third of the gas used will be hydrogen produced by water splitting. The installation will be powered by an 80 megawatt photovoltaic park. The park will cover the area of the former coal ash dump. The technology was chosen because of its high effectivity, the Varna thermoelectric power plant management says. Under the contract signed the new station is to start functioning at the beginning of 2025.
A 6-month reconstruction of the runway and renovation of the aprons start at Burgas Airport. November 10 marks 19 years since the start of the Burgas Airport concession. The investment in one of the largest infrastructure projects by..
Bulgaria is strengthening land, water and air security (including with a drone protection system) at Lukoil's sites on its territory, the government press service announced. The State Agency for National Security (SANS) entered the..
On Saturday , the lowest temperatures will be between 7 and 12°C; in Sofia - around 8°. In the morning hours visibility will be reduced in the plains. Before noon, precipitation will temporarily stop. In the second half of the day,..
On Wednesday, minimum temperatures will range from 4 to 9°C across the country, reaching around 2°C in Sofia. The wind will ease and fog will settle in..
The amount of the average social security income for the country for September 2025 is 962.25 EUR and the amount of the average monthly social security..
Bulgaria’s Energy Minister, Zhecho Stankov, has reassured citizens and businesses that the country’s fuel supplies are sufficient to last for an extended..
+359 2 9336 661