550 megawatts of new gas capacities are going to be built at Varna thermoelectric power station on an investment of 450 million euro, the management of the station, with major shareholder the Movement for Rights and Freedoms’ honorary chairman Ahmed Dogan, has announced.
The two 275 megawatt blocs will be engineered from Siemens technology and will be built by Russian companies. Up to one-third of the gas used will be hydrogen produced by water splitting. The installation will be powered by an 80 megawatt photovoltaic park. The park will cover the area of the former coal ash dump. The technology was chosen because of its high effectivity, the Varna thermoelectric power plant management says. Under the contract signed the new station is to start functioning at the beginning of 2025.
The majority in parliament overcame the president's veto on the Investment Promotion Act. The bill was passed in second reading on October 24, but President Rumen Radev vetoed parts of it, arguing that the proposed rules specifically..
Deputy Prime Ministers and Ministers of Transport Grozdan Karadzhov and Aleksandar Nikoloski signed an agreement in Gyueshevo for the construction of a railway tunnel between Bulgaria and the Republic of North Macedonia. The facility..
The police have neutralized an organized crime group that transported migrants from Burgas through Sofia to the Serbian border, Sofia District Prosecutor Natalia Nikolova said at a briefing. She indicated that 13 addresses were..
Research ship "Sts. Cyril and Methodius" has departed from Varna after a solemn ceremony. In its fourth voyage to Antarctica the ship..
Sales of starter sets with euro coins with the Bulgarian national side will begin on December 1, 2025 , the BNB announced. They will be in circulation..
On Saturday , the lowest temperatures will be between 7 and 12°C; in Sofia - around 8°. In the morning hours visibility will be..
+359 2 9336 661