The planned annual repairs of Unit VI of Kozloduy NPP have been completed five days ahead of schedule. On November 1, at 1.41 am, it joined the country's energy system after an inspection and approval by the Nuclear Regulatory Agency.
The unit was stopped on September 29. For 31 days, the capacity of 1,000 megawatts was not part of the electricity market, which caused further rise of energy prices in Bulgaria.
Equipment maintenance has been performed and the unit has been refueled with fresh nuclear fuel. All the planned activities related to increasing the safety and ensuring the long-term operation of the unit have been carried out. The 5th nuclear power unit of Kozloduy is also operating at full capacity, the power plant's head Nasko Mihov said.
The due date for preventing the prospect of Borislav Sarafov taking the position of prosecutor general is drawing close, as is the deadline for coordinating the budget, Ivaylo Mirchev from Democratic Bulgaria said in an interview with public service..
A campaign against street violence named Stand Up will be held today and tomorrow under the dome of Sofia's Largo, said the Regional History Museum – Sofia. It turns out that over 80% of women worldwide have experienced some form of street..
A mural dedicated to the 20th anniversary of Bulgaria's NATO accession will be unveiled today in Pernik. The event will be attended by the ambassadors of Great Britain, Turkey and Montenegro, Deputy Foreign Minister Nevyana Miteva, Pernik Regional..
The average gross annual salary in Bulgaria in 2023 is 24,485 BGN (EUR 12,519) which is an increase of 15.3% compared to 2022, according to data from..
On Friday, cloudy weather will prevail over the country. The wind will be oriented from the northwest, will strengthen and in the Danube Plain its speed..
The due date for preventing the prospect of Borislav Sarafov taking the position of prosecutor general is drawing close, as is the deadline for..
+359 2 9336 661