Maritsa-Iztok 3 coal-fired power plant in Dimitrovgrad has been functioning since last night, BNR’s correspondent Dora Atanassova reports.
The thermal power plant was closed down at the end of April over air pollution, which triggered protests by the TPPs staff. Two days ago the court annulled the suspension of its operation but yesterday Minister of Environment and Water Borislav Sandov updated Maritsa-Iztok 3’s integrated permit, enhancing the requirements in accordance with European legislation. Minister Sandov pointed out that the operator has only partially fulfilled the requirements. For Maritsa-Iztok 3 to be made operational it has to meet the requirements set down. Activists from the movement “Breathe Dimitrovgrad!” got together last night in front of the TPP building when they saw it was operational. “We are not against the TPP working but it must work according to the rules,” they said.
“The power plant has been made operational in accordance with the court decision,” said Maritsa 3’s chief legal officer Julian Semerdjiev.
Bulgaria and Vietnam should make the most of their strategic geographic positions – Vietnam in Southeast Asia and Bulgaria in Southeast Europe – acting as a gateway for goods and services from Asia to Europe , President Rumen Radev said on Thursday. He..
The Institute for Computer Science, Artificial Intelligence and Technology (INSAIT) at Sofia University ‘St. Kliment Ohridski’ has released SPEAR-1, an open-source AI model that gives industrial robots 3D spatial intelligence . The technology is..
To Lam, the General Secretary of the Communist Party of Vietnam, is on an official visit to Bulgaria. He was welcomed at a ceremony in St. Alexander Nevsky Square by President Rumen Radev and his wife, Desislava Radeva, as reported by the Bulgarian..
The international scientific conference “Bulgarians in the Northern Black Sea Region” will be held in Sofia on October 27 and 28, 2025 in the Institute..
+359 2 9336 661