Bulgaria’s Ministry of Finance announced that an inspection conducted by Public Financial Inspection Agency found serious violations in the completion of Hemus motorway. A contract between the Road Infrastructure Agency and Avtomagistralli EAD for the completion of Lots 7, 8 and 9 of Hemus Motorway to the tune of EUR 690 million excluding VAT was subject to inspection.
The inspection found that the estimated prices were inflated by more than EUR 9 million. Prices for various materials and construction works on the above-mentioned lolts of the motorway were also inflated. The inspection also found that the Public Procurement Act had been circumvented during subcontracting of construction works by Avtomagistral EAD under 15 design contracts.
"We Continue the Change" (PP) party called for a protest and blockade of the National Assembly building to stop the adoption of the budget for next year. The MPs are discussing the budget at first reading. PP received support for..
The share of foreign students in Bulgaria has more than doubled in the last decade. In 2013, they were nearly 4 percent while in 2025 their number reaches 9% of active students. This is indicated by the annual Ranking of Higher..
Over 3,000 antiques worth more than EUR 100 million have been seized in an international operation, coordinated from Sofia, the Greek police reported. One of the largest antiquities smuggling networks has been dismantled with the support of Europol..
Bulgaria will not have to bail out eurozone countries that are experiencing difficulties. This is what Lilyana Pavlova, former vice..
Bulgarian and Chinese researchers discussed scientific cooperation at a forum in Sofia on Friday, attended by representatives of the Bulgarian Academy of..
Bulgaria lacks a coherent national policy on refugees despite continued migrant flows , Vice President Iliana Iotova said on Wednesday, calling for a lead..
+359 2 9336 661