Bulgaria’s Ministry of Finance announced that an inspection conducted by Public Financial Inspection Agency found serious violations in the completion of Hemus motorway. A contract between the Road Infrastructure Agency and Avtomagistralli EAD for the completion of Lots 7, 8 and 9 of Hemus Motorway to the tune of EUR 690 million excluding VAT was subject to inspection.
The inspection found that the estimated prices were inflated by more than EUR 9 million. Prices for various materials and construction works on the above-mentioned lolts of the motorway were also inflated. The inspection also found that the Public Procurement Act had been circumvented during subcontracting of construction works by Avtomagistral EAD under 15 design contracts.
The situation in the country illustrates the urgent need for the state to create conditions for holding more farmers' markets, where farmers can sell their produce directly to consumers. This was stated by the Bulgarian Farmers' Union in connection..
A specialized police operation by the Directorate of the Bulgarian Anti-Drug and Drug Enforcement Administration (GDBOP) uncovered an organized crime group operating in the Blagoevgrad region , related to the distribution of narcotics. 5 kg of..
Over 70% of Bulgarians are categorically against sending a military contingent to Ukraine. This was stated by Dimitar Ganev from the sociological agency “Trend” in an interview for the Bulgarian National Radio. President Radev opposes sending..
In Plovdiv, experts discuss issues of the food industry, in accordance with the most up-to-date requirements of the Bulgarian and European regulatory..
More than 550,000 people received support last year under the European programme Food and Basic Material Assistance – packages of staple foods and nine..
For the third year running, the number of young doctors who want to remain in Bulgaria after graduation has been going up, indicate the results of a..
+359 2 9336 661