All principal construction work on the gas interconnector between Bulgaria and Greece via Komotini has been completed. Since mid-June the pipeline equipment has been filled and tested successfully with compressed natural gas. The gas pipeline, the seven valve stations, the two gas metering stations and the dispatch centre are technically viable, construction supervision has ascertained.
The Bulgarian-Greek company ICGB, which is the investor and future operator of the interconnector issued a statement denying allegations that the pipeline is unfinished. ICGB has submitted, to the Ministry of Regional Development and Public Works, a two-stage plan for the completion of the accompanying works.
The interconnector can be made operational in test mode at the end of August, ICGB says.
Butter and vegetable oil are the products that have increased in price the most over the year. The retail price of vegetable oil will range between 3 and 5 BGN (EUR 1.5-2.5) per liter until the new harvest. The value of the small consumer basket,..
The assets of private pension funds have reached EUR 13 billion. According to data from the Financial Supervision Commission, they have increased by more than 20% compared to the same period last year. As of September 30, 2024, the number of..
There has been an upsurge in the economy in every region of Bulgaria, the effects of the Covid crisis have been overcome, tourism has fully recovered, which is evident in Bulgarian seaside regions and spa resorts - this is the conclusion that is drawn..
Butter and vegetable oil are the products that have increased in price the most over the year. The retail price of vegetable oil will range between 3..
+359 2 9336 661