Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Prime Minister confirms national priorities to European ambassadors

Caretaker Prime Minister Galab Donev.
Photo: government.bg

Caretaker Prime Minister Galab Donev confirmed to the ambassadors of the EU countries that Bulgaria's main priority remains the country's accession to Schengen and the euro zone. He voiced his expectations for progress in the coming months.
The Prime Minister, the diplomats and the European Commission representation in Sofia held a working meeting at the Boyana residence. 
Speaking about the preparations for the introduction of the euro, Galab Donev pointed out that the caretaker cabinet is implementing the National Plan, which foresees the introduction of the European currency on 1 January 2024. 
He also informed that a team of the European Commission will arrive in Bulgaria this month to confirm the degree of implementation of the Schengen acquis. According to the Prime Minister, Bulgaria had met the Schengen accession criteria as early as 2011. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Festive Christmas spirit pervades the Bulgarian capital

Sofia will welcome the Christmas and New Year holidays with brilliant decorations in all areas of the city. A major highlight in the transformation of the capital will be the beautiful Christmas trees placed in key locations. The tallest among..

published on 11/24/24 9:50 AM

Sunny but chilly Sunday

Overnight it will be mostly clear. Winds will weaken and die down in many areas. In the morning it will be cold, with minimum temperatures between minus 7 and minus 2°C, reaching minus 10°C in the valleys and around minus 9°C in Sofia. Tomorrow will be..

published on 11/23/24 7:05 PM

Unit 6 of Kozloduy NPP connected to the national grid after annual maintenance

The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07 following an inspection by the Nuclear Regulatory Agency. In addition to the repairs made to improve..

published on 11/23/24 2:09 PM