Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

The body of Ukrainian fighter pilot surfaces in the sea near Tsarevo

Colonel Mykhailo Matyushenko was buried in Bucha
Photo: glavcom.ua

The body of a Ukrainian fighter pilot surfaced in the sea near Bulgaria’s Tsarevo in September, the Regional Police Directorate in Burgas has announced.

Because of the long time the body spent in the water it was difficult to identify. After the Ukrainian air forces were contacted, he was identified by the service number on his metal tag, which was highly oxidized.

The pilot is 61-year old Colonel Mykhailo Matyushenko, the doyen of Ukraine’s air force, known by the call sign “Did” (Grandpa). He was shot down on 26 June in an aerial battle over the Black Sea. The body has been returned and was buried in Bucha near Kyiv on 4 October. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Rosen Zhelyazkov meets J.D. Vance in Paris

US to PM Zhelyazkov: We look forward to continuing our successful cooperation

We agree, Prime Minister, and look forward to continuing our successful cooperation in multiple fields, advancing our shared strength, security, and prosperity , the US embassy in Bulgaria wrote, in connection with yesterday’s brief meeting between..

published on 2/12/25 2:44 PM
Iskra Mihaylova

Vazrazhdane is against the sale of the two reactors for the Belene NPP project to Ukraine

Vazrazhdane party declared they were opposed to the sale of two Russian reactors intended for use in the failed Belene nuclear power plant project to Ukraine. “Belene NPP is one of the most advanced nuclear power plant projects in Europe, and we..

published on 2/12/25 1:54 PM
PM Rosen Zhelyazkov

Government approves roadmap and route for completing Struma motorway by 2031

The Council of Ministers approved a roadmap for the completion of Struma motorway. According to the schedule, an open tender for preliminary design is to be launched in February 2025 for the uncompleted Simitli-Kresna section. The route will be..

published on 2/12/25 1:33 PM