Unit 6 of Kozloduy Nuclear Power Plant will be shut down for scheduled annual maintenance as of today, the NPP’s press service has announced.
The maintenance will include preventive technical maintenance and repairs of the equipment and systems to ensure the unit’s safe and reliable operation, as well as stable energy supplies during the autumn and winter period. The reactor will be reloaded with fresh fuel. The maintenance works are expected to be completed by the end of November. Unit 5 of NPP Kozloduy will operate according to the power generation schedule.
Changes are felt in the air, as students have restored hope that had not been there for years - these are some of the messages from the forum on the topic "What kind of society are we striving for?", which took place in the hall of..
Heavy traffic is expected on the first working day of the New Year. The most intense traffic is expected to be from Greece, as according to tour operators, most of the New Year's packages end on January 2. Thousands of Bulgarians chose to welcome..
Significant economic benefits are expected for Bulgaria (population 6.5 million) and Romania (19 million), which have become full members of the Schengen area. According to estimates, GDP is likely to grow by at least 1% in both..
Caretaker Prime Minister Dimitar Glavchev was welcomed today at the "Kulata" border checkpoint on Bulgaria’s border with Greece with..
Exactly at midnight on January 1, with a symbolic lifting of the border barrier, Minister of Interior of Bulgaria Atanas Ilkov and his..
During the night, the sky will be clear in many places, but in the valleys there will be fog. On Thursday afternoon, visibility will..
+359 2 9336 661