Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Kozloduy NPP's Unit 6 switched off for scheduled annual maintenance

Photo: BGNES

Unit 6 of Kozloduy Nuclear Power Plant will be shut down for scheduled annual maintenance as of today, the NPP’s press service has announced.

The maintenance will include preventive technical maintenance and repairs of the equipment and systems to ensure the unit’s safe and reliable operation, as well as stable energy supplies during the autumn and winter period. The reactor will be reloaded with fresh fuel. The maintenance works are expected to be completed by the end of November. Unit 5 of NPP Kozloduy will operate according to the power generation schedule. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Gas price rises by 7.97 percent

The Energy and Water Regulatory Commission has approved the price of natural gas for January at 81.94 BGN/MWh, excluding taxes. Although the approved price of 81.94 BGN/MWh is higher than the price for December by 7.97%, it is..

published on 1/1/25 5:44 PM

NRA strengthens control over goods with high fiscal risk

After Bulgaria's full entry into Schengen, the National Revenue Agency is strengthening control over goods with high fiscal risk. The checks will be carried out in the country and at the places of unloading of goods for which the..

published on 1/1/25 4:33 PM

Prime Minister Glavchev: Together we will guard the EU's external borders much better

Caretaker Prime Minister Dimitar Glavchev was welcomed today at the "Kulata" border checkpoint on Bulgaria’s border with Greece with bread, salt, honey and wishes for a healthy and prosperous year. He went there to check the new..

published on 1/1/25 2:48 PM