Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Kozloduy NPP's Unit 6 switched off for scheduled annual maintenance

Photo: BGNES

Unit 6 of Kozloduy Nuclear Power Plant will be shut down for scheduled annual maintenance as of today, the NPP’s press service has announced.

The maintenance will include preventive technical maintenance and repairs of the equipment and systems to ensure the unit’s safe and reliable operation, as well as stable energy supplies during the autumn and winter period. The reactor will be reloaded with fresh fuel. The maintenance works are expected to be completed by the end of November. Unit 5 of NPP Kozloduy will operate according to the power generation schedule. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

National Statistical Institute reports stable GDP growth of 3.1 percent

In the first quarter of 2025, GDP grew by 3.1% compared to the first quarter of 2024 and by 0.6% compared to the fourth quarter of 2024, the National Statistical Institute announced. Converted into euros, GDP is 23.324 billion..

published on 6/6/25 2:18 PM
Rosen Zhelyazkov

Prime Minister says Bulgaria has no unresolved bilateral issue with Skopje

The position of the Republic of Bulgaria is clear. We have no bilateral issue with the Republic of North Macedonia. This was what Prime Minister Rosen Zhelyazkov said in parliament and recalled that last week the National Assembly..

published on 6/6/25 1:23 PM
Tomislav Donchev

Bulgaria hopes to receive half of the funds under NRRP by the end of the year

Bulgaria will send a new request for a second payment under the National Recovery and Resilience Plan in July, Deputy Prime Minister and Minister of Innovation and Growth Tomislav Donchev announced during parliamentary control...

published on 6/6/25 1:01 PM