Unit 6 of Kozloduy Nuclear Power Plant will be shut down for scheduled annual maintenance as of today, the NPP’s press service has announced.
The maintenance will include preventive technical maintenance and repairs of the equipment and systems to ensure the unit’s safe and reliable operation, as well as stable energy supplies during the autumn and winter period. The reactor will be reloaded with fresh fuel. The maintenance works are expected to be completed by the end of November. Unit 5 of NPP Kozloduy will operate according to the power generation schedule.
Two billion euros in additional state guarantees and a concession of the Bulgarian Sports Totalizator are part of changes to the draft budget for 2026, submitted between the first and second readings. The change that increases the..
The increase in the minimum wage is supported by 54.1% of Bulgarians. 1/3 of respondents believe that the minimum wage should be equal to the living wage. This is indicated by the results of a representative survey by the Myara..
“We see a rational plan for a quick peace from President Donald Trump, according to which the situation on the battlefield is developing extremely unfavorably for Ukraine, and he is trying to prevent a worse scenario and additional casualties,”..
+359 2 9336 661