Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Kozloduy NPP's Unit 6 switched off for scheduled annual maintenance

Photo: BGNES

Unit 6 of Kozloduy Nuclear Power Plant will be shut down for scheduled annual maintenance as of today, the NPP’s press service has announced.

The maintenance will include preventive technical maintenance and repairs of the equipment and systems to ensure the unit’s safe and reliable operation, as well as stable energy supplies during the autumn and winter period. The reactor will be reloaded with fresh fuel. The maintenance works are expected to be completed by the end of November. Unit 5 of NPP Kozloduy will operate according to the power generation schedule. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Yellow code for strong wind in 16 eastern and southwestern regions

On Wednesday , the lowest temperatures will be between 3 and 8°C. In the regions with strong wind it will be up to 10-12°C. In Sofia it will be around 4°C. In the western parts of the Danube Plain and the Upper Thracian Plain it will..

published on 11/25/25 7:50 PM

Drones to aid disaster and fire response in Burgas

Following a series of fires in the Burgas area last summer, including one that destroyed homes in a local villa district, the Burgas municipality has acquired high-tech drones equipped with thermal cameras, night vision, and 3D imaging . The two..

published on 11/25/25 7:01 PM

Bulgarian police break up migrant smuggling network

Illegal migrants from Syria, Iraq and Iran have been discovered in Sofia, and ten members of an organised criminal group have been arrested , Deputy City Prosecutor Desislava Petrova told reporters. Two of those arrested have been charged as the..

published on 11/25/25 6:48 PM