All activities connected with the gas interconnection Bulgaria – Serbia have been completed. The interconnector will allow for a safer and more stable gas supply from different sources, most of all Azerbaijan, said Serbia’s Energy Minister Dubravka Handanovic, after inspecting the project which is of strategic importance to Serbia. “The Serbia-Bulgaria gas pipeline is the first major energy project to have been completed on schedule. We started work just one year ago, and in 12 months of hard work, 109 kms. of new gas pipeline was built, as well as four measuring and regulating stations in Pirot, Tsaribrod, Bela Palanka and Nis, as well as a big station at Trupale. I am expecting the gas pipeline to be put into trial operation by the end of the week,” Minister Handanovic said. The official inauguration of the gas pipeline will be attended by the presidents of Bulgaria and Azerbaijan.
Slovak Ambassador Vasil Grivna was summoned to the Ministry of Foreign Affairs over official statements made by Slovak President Peter Pellegrini during his visit to Skopje on October 14. There were unacceptable assessments made..
On behalf of the Head of State Rumen Radev, Vice President Iliana Iotova presented the Order of Sts. Cyril and Methodius, first degree, to Professor Ma Sipu, the press office of the president reported. The award was presented at..
On the occasion of the Aviation and Air Force Day on October 16, at 09:00, flowers and wreaths will be laid at the Aviators Monument near the National Assembly in the capital city, the Ministry of Defense reports. The solemn..
Russia’s Deputy Minister of Foreign Affairs Alexander Grushko stated that Moscow has not held talks regarding a possible overflight of President..
Russian spies and hard-left humanitarian groups are working with people smugglers to food Europe with illegal migrants, wrote '' The Times'' , quoting..
Bulgaria, Greece and Romania have finalized a memorandum for joint cooperation on new transport projects, said European Commissioner for..
+359 2 9336 661