The rehabilitated 5th unit of the Belmeken Pumped Storage Hydro Power Plant (Belmeken PSHPP) has officially been opened by Prime Minister Nikolai Denkov and Energy Minister Rumen Radev, public service TV BNT reports.
The project is worth EUR 10 million, 70% of which from the Kozloduy fund, and manager of the programme is the European Bank, Minister Radev said. The first two units were made operational in 2022, another 2 - in 2023, and the last unit is being made operational now. In the past few years the role of these facilities has surpassed the expectations of the people who built them, and pumped storage hydro power plants are now part of the flexibility of our energy system, PM Denkov stated further.
Seven-year-old Magdalena Stoyanova from art school "Kolorit" in Pleven received a gold medal and a distinction from the international children's drawing competition "Health 2025". The award ceremony took place in Sao Paulo,..
A 6-month reconstruction of the runway and renovation of the aprons start at Burgas Airport. November 10 marks 19 years since the start of the Burgas Airport concession. The investment in one of the largest infrastructure projects by..
Bulgaria is strengthening land, water and air security (including with a drone protection system) at Lukoil's sites on its territory, the government press service announced. The State Agency for National Security (SANS) entered the..
The Sofia City Court has postponed the extradition case of Igor Grechushkin, the owner of a cargo ship linked to the explosion at the port of Beirut in..
The Road Infrastructure Agency (RIA) has proposed the introduction of temporary restrictions on the movement of heavy trucks weighing over 12 tons along..
Bulgaria has sufficient quantities of fuel and the 90-day reserves are secured at around 98%, Asen Asenov, Chairman of the State Reserve and Wartime..
+359 2 9336 661