The rehabilitated 5th unit of the Belmeken Pumped Storage Hydro Power Plant (Belmeken PSHPP) has officially been opened by Prime Minister Nikolai Denkov and Energy Minister Rumen Radev, public service TV BNT reports.
The project is worth EUR 10 million, 70% of which from the Kozloduy fund, and manager of the programme is the European Bank, Minister Radev said. The first two units were made operational in 2022, another 2 - in 2023, and the last unit is being made operational now. In the past few years the role of these facilities has surpassed the expectations of the people who built them, and pumped storage hydro power plants are now part of the flexibility of our energy system, PM Denkov stated further.
Bulgaria’s Premier Rosen Zhelyazkov and Ukrainie’s President Volodymyr Zelenskyy discussed energy security in the region and opportunities to strengthen cooperation in this area. The two held a phone conversation on November 6. They also discussed..
Six migrants died after the car transporting them overturned on the shore of Lake Vaya near Burgas. Before the accident, the traffickers’ car had been chased by border police between the towns of Kiten and Burgas. The driver of the car — a Romanian..
In the period November 7 to 9, Sofia Tech Park will host the tenth edition of CASSINI Hackathons & Mentoring, organized by the European Commission and the European Union Agency for the Space Programme (EUSPA). The hackathon will..
The Sofia City Court has postponed the extradition case of Igor Grechushkin, the owner of a cargo ship linked to the explosion at the port of Beirut in..
The Road Infrastructure Agency (RIA) has proposed the introduction of temporary restrictions on the movement of heavy trucks weighing over 12 tons along..
On Tuesday, minimum temperatures will range from 8 to 13°C , with Sofia seeing around 9°C. Rain is expected across the country, with heavier showers in..
+359 2 9336 661