Interdepartmental working groups will work towards the speedier implementation of the projects for the construction of new nuclear capacities at Kozloduy NPP and the Vertical Gas Corridor, the Council of Ministers press service has announced. The groups were set up by order of caretaker PM Dimitar Glavchev.
The projects, part of the Vertical Gas Corridor initiative between Bulgaria, Greece, Romania, Hungary, Slovakia, Ukraine and Moldova, will provide for the transit of additional quantities of natural gas from diverse and reliable sources in a South-North direction.
The construction of new nuclear capacities at Kozloduy NPP is a strategic project for the country. In the autumn of last year, the Nikolai Denkov government announced a procedure for the construction of a 7th and 8th reactor at Kozloduy nuclear power plant. Their construction is scheduled to be completed in 2033 and 2036 respectively.
Research ship "Sts. Cyril and Methodius" has departed from Varna after a solemn ceremony. In its fourth voyage to Antarctica the ship is expected to reach the Bulgarian Antarctic base on Livingston Island by the end of December and..
The Sofia Police announced that they will use drones to monitor fans before and during the football match between Levski and CSKA, which will be held on Saturday at 3:00 p.m. at the Vasil Levski National Stadium. There will be..
The overall consumer confidence index in October 2025 fell by 4 points compared to July, the National Statistical Institute has reported. In July, the indicator decreased by 4.7 points compared to April. In October, there was an..
Bulgaria is strengthening land, water and air security (including with a drone protection system) at Lukoil's sites on its territory,..
A 6-month reconstruction of the runway and renovation of the aprons start at Burgas Airport. November 10 marks 19 years since the start..
+359 2 9336 661