Interdepartmental working groups will work towards the speedier implementation of the projects for the construction of new nuclear capacities at Kozloduy NPP and the Vertical Gas Corridor, the Council of Ministers press service has announced. The groups were set up by order of caretaker PM Dimitar Glavchev.
The projects, part of the Vertical Gas Corridor initiative between Bulgaria, Greece, Romania, Hungary, Slovakia, Ukraine and Moldova, will provide for the transit of additional quantities of natural gas from diverse and reliable sources in a South-North direction.
The construction of new nuclear capacities at Kozloduy NPP is a strategic project for the country. In the autumn of last year, the Nikolai Denkov government announced a procedure for the construction of a 7th and 8th reactor at Kozloduy nuclear power plant. Their construction is scheduled to be completed in 2033 and 2036 respectively.
Six migrants died after the car transporting them overturned on the shore of Lake Vaya near Burgas. Before the accident, the traffickers’ car had been chased by border police between the towns of Kiten and Burgas. The driver of the car — a Romanian..
In the period November 7 to 9, Sofia Tech Park will host the tenth edition of CASSINI Hackathons & Mentoring, organized by the European Commission and the European Union Agency for the Space Programme (EUSPA). The hackathon will..
On Friday , the lowest temperatures will be between 5 and 10°C; in Sofia - it will be around 6°C. During the day it will be cloudy and with precipitation. In Northwestern Bulgaria the amounts will be significant. Almost no..
Bulgaria is strengthening land, water and air security (including with a drone protection system) at Lukoil's sites on its territory,..
A 6-month reconstruction of the runway and renovation of the aprons start at Burgas Airport. November 10 marks 19 years since the start..
+359 2 9336 661